We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

Showing 30-40 of 56 results
Most relevant

From textile equipment manufacturer in China to global market leader.

Date: 22/11/2017 12:00:00 AM

From their first days of manufacture, we have worked alongside our client in China to support their ambitious vision.

Case study: Installing a converter platform (TenneT)

Date: 22/11/2017 12:00:00 AM

Converting offshore wind power at sea and transmitting it to shore. Acting as the certifying authority for safe installation of the BorWin gamma platform.

Case Study
Energy
Offshore Wind
Sustainability

Case study: Giving TEPCO the confidence to restart nuclear reactors

Date: 22/11/2017 12:00:00 AM

Independent technical audits for the world’s largest nuclear power plant, Japan, enabling restart following the Fukushima tsunami. Read more in our case study.

Case Study
Energy
Nuclear
Sustainability

Shaping an investor’s commercial strategy.

Date: 22/11/2017 12:00:00 AM

Shaping an investor’s commercial strategy. Independent assessment and verification of offshore technical elements, Malaysia. Read our case study.

Woodside: Fitting a large rig deck by ‘float-over’ method.

Date: 22/01/2018 11:00:00 PM

Fitting a large rig deck by ‘float-over’ method. Independent validation of design, construction and installation. Read our case study.

ASC certification aids growth for Loch Fyne Oysters

Date: 22/01/2018 11:00:00 PM

Loch Fyne Oysters is a seafoods, fish, meat, oysters and game company which also founded the Loch Fyne restaurant chain

Case Study
Food, Beverage & Hospitality
Processors
Retail

EDF Energy relies on LRQA RiskSpectrum to monitor risk at Sizewell B

Date: 18/06/2018 9:00:00 AM

LRQA's RiskSpectrum suite gives EDF Energy real-time risk monitoring capability, based on a fully validated living PSA model.

Case Study
Nuclear
Energy
Software & Digital Services

Case study - Maintenance cost and risk reduced by 55%.

Date: 22/11/2017 12:00:00 AM

Maintenance cost and risk reduced by 55%.

Case Study
In-life & Operation
Asset Life Extension
Asset Management

Katoni: Make health and safety matter.

Date: 13/02/2019 3:00:00 PM

Katoni achieves ISO 45001 with LRQA. This case study states the preparation process from OHSAS 18001 to ISO 45001 Katoni took for a successful migration.

ISO 45001
Health & Safety

DB Schenker: Reaching a quality management milestone.

Date: 22/11/2017 12:00:00 AM

Reaching a quality management milestone. Certification to ISO 9001:2015, just a month after the revised standard’s publication. Read our case study.

Transport & Logistics
ISO 9001
Quality
Can't find what you are looking for?